TAP170887
SubstationNew Hampshire
TAP170887 is an electric transmission substation in New Hampshire. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP170887, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN132814 | Substation-Adjacent | VT | Windham County | 345 kV | 600 MW | 4.3 yrs | 63.8 |
| FITZWILLIAM | Substation-Adjacent | NH | Cheshire County | 345 kV | 600 MW | 4.3 yrs | 63.5 |
| VERMONT YANKEE | Substation-Adjacent | VT | Franklin County | 345 kV | 600 MW | 4.3 yrs | 61.4 |
| NORTHFIELD | Substation-Adjacent | MA | Franklin County | 345 kV | 600 MW | 4.3 yrs | 60.7 |
| SCOBIE | Substation-Adjacent | NH | Cheshire County | 115 kV | 100 MW | 4.3 yrs | 58.1 |
| WESTPORT | Substation-Adjacent | NH | Cheshire County | 115 kV | 100 MW | 4.3 yrs | 57.8 |
| HARRIMAN | Substation-Adjacent | VT | Windham County | 115 kV | 100 MW | 4.3 yrs | 57.5 |
| UNKNOWN135561 | Substation-Adjacent | VT | Windham County | 115 kV | 100 MW | 4.3 yrs | 57.5 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP170887 substation, New Hampshire is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.