Cheshire County, New Hampshire · ISO-NE

DC Readiness
62.2
Good / 100

FITZWILLIAM is a substation-adjacent datacenter candidate site in Cheshire County, New Hampshire, interconnecting through ISO-NE. It screens at 62.2/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationFITZWILLIAM
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
UtilityPUBLIC SERVICE CO OF NHinvestor ownedmoderate to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionISO-NE
Queue depth3
Avg queue wait3.9 yrs

Connectivity

Nearest IXPColoSpace - Bedford, NH
IXP distance35.8 mi
Fiber providers6
Fiber coverage86.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterColoSpace - Bedford, NH
DC distance35.8 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity14.87¢/kWh
Industrial electricity13.29¢/kWh
Cooling degree days400
Heating degree days7,200
Land price / acre$7,375

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track FITZWILLIAM

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
42
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
94
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Cheshire County, ranked by DC Readiness.

Sites near FITZWILLIAM
SiteTypeVoltageCapacityQueue waitScore
SCOBIESubstation-Adjacent115 kV100 MW3.9 yrs56.8
WESTPORTSubstation-Adjacent115 kV100 MW3.9 yrs56.5
EAST WINCHENDONSubstation-Adjacent115 kV100 MW3.9 yrs56.4
TAP170885Substation-Adjacent115 kV100 MW3.9 yrs56.3
KEENESubstation-Adjacent115 kV100 MW3.9 yrs56.2
Greenfield (FITZWILLIAM - AMHERST)Greenfield345 kV600 MW3.9 yrs56.2
SWANZEYSubstation-Adjacent115 kV100 MW3.9 yrs56.1
MONADNOCKSubstation-Adjacent115 kV100 MW3.9 yrs55.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FITZWILLIAM, Cheshire County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.