TAP149099

Substation

Missouri · EMPIRE DISTRICT ELECTRIC CO

Max voltage
69
kV

At a glance

TAP149099 is a 69 kV electric substation in Missouri on EMPIRE DISTRICT ELECTRIC CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is OZ Newton in Newton, with a DC Readiness score of 61/100.

TAP149099 is an electric transmission substation in Missouri, on EMPIRE DISTRICT ELECTRIC CO's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)EMPIRE DISTRICT ELECTRIC CO
Coordinates36.8489, -94.5580

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#11200569 kVEMPIRE DISTRICT ELECTRIC COIN SERVICE7.3 mi
#11768369 kVEMPIRE DISTRICT ELECTRIC COIN SERVICE2.9 mi
#13731669 kVPUBLIC SERVICE CO OF OKLAHOMAIN SERVICE4.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP149099, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP149099 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ NewtonGreenfieldMONewton——3.9 yrs61.2
Oronogo-Duenweg Mining Belt Superfund Solar SiteBrownfieldMOJasper—2 MW3.9 yrs61.1
OZ NewtonGreenfieldMONewton——3.9 yrs60.8
OZ JasperGreenfieldMOJasper——3.9 yrs59.8
EC Coal Cherokee CountyGreenfieldKSCherokee County——4.3 yrs59.2
OZ OttawaGreenfieldOKOttawa——4.3 yrs59.2
EC Coal Ottawa CountyGreenfieldOKOttawa County——4.3 yrs59.1
UNKNOWN117583Substation-AdjacentMOMcDonald County161 kV100 MW3.9 yrs59.0

Who owns the transmission lines at TAP149099?

The 3 connected lines listed above are owned by EMPIRE DISTRICT ELECTRIC CO, PUBLIC SERVICE CO OF OKLAHOMA. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 15.1 miles.

How do candidate sites near TAP149099 score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 61 on the 0–100 DC Readiness scale. They fall in Newton, Jasper, Cherokee County, Ottawa. The Missouri average across 3,413 scored sites is 55.7. 1,002 of those Missouri sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP149099 substation?

TAP149099 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP149099 is below the national midpoint.

How many transmission lines connect to TAP149099 substation?

3 transmission lines terminate at or pass through TAP149099 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 15.1 miles.

Who owns TAP149099 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP149099 belong to EMPIRE DISTRICT ELECTRIC CO, and others to PUBLIC SERVICE CO OF OKLAHOMA. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP149099 substation located?

TAP149099 is in Missouri at 36.8489, -94.5580. The datacenter candidate sites closest to it are in Newton, Jasper, Cherokee County.

Are there datacenter candidate sites near TAP149099 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP149099. The highest-scoring is OZ Newton at 61/100. Across Missouri, the average DC Readiness score is 55.7.

More in Missouri

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP149099 substation, Missouri”, https://gridcensus.com/substations/missouri/tap149099-5bcfde70 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP149099 substation, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.