Substation

Missouri · EMPIRE DISTRICT ELECTRIC CO

Max voltage
161
kV

At a glance

TAP149098 is a 161 kV electric substation in Missouri on EMPIRE DISTRICT ELECTRIC CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN173548 in Jasper County, with a DC Readiness score of 63/100.

TAP149098 is an electric transmission substation in Missouri, on EMPIRE DISTRICT ELECTRIC CO's transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership

Line owner (most lines)EMPIRE DISTRICT ELECTRIC CO
Coordinates37.0011, -94.5322

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#104501161 kVEMPIRE DISTRICT ELECTRIC COIN SERVICE5.7 mi
#104729161 kVEMPIRE DISTRICT ELECTRIC COIN SERVICE5.7 mi
#140339161 kVEMPIRE DISTRICT ELECTRIC COIN SERVICE1.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP149098, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP149098 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN173548Substation-AdjacentMOJasper County345 kV600 MW3.9 yrs63.3
OZ NewtonGreenfieldMONewton——3.9 yrs61.2
UNKNOWN133896Substation-AdjacentMOCherokee County345 kV600 MW3.9 yrs61.1
Oronogo-Duenweg Mining Belt Superfund Solar SiteBrownfieldMOJasper—2 MW3.9 yrs61.1
OZ NewtonGreenfieldMONewton——3.9 yrs60.8
OZ JasperGreenfieldMOJasper——3.9 yrs59.8
OZ OttawaGreenfieldOKOttawa——4.3 yrs59.2
EC Coal Cherokee CountyGreenfieldKSCherokee County——4.3 yrs59.2

Who owns the transmission lines at TAP149098?

The 3 connected lines listed above are owned by EMPIRE DISTRICT ELECTRIC CO. Line voltages range from 161 kV to 161 kV. Their combined recorded length is about 12.7 miles.

How do candidate sites near TAP149098 score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 63 on the 0–100 DC Readiness scale. They fall in Jasper County, Newton, Cherokee County, Jasper. The Missouri average across 3,413 scored sites is 55.7. 1,002 of those Missouri sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP149098 substation?

TAP149098 has a maximum voltage of 161 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP149098 is above the national midpoint.

How many transmission lines connect to TAP149098 substation?

3 transmission lines terminate at or pass through TAP149098 in the HIFLD line data. The connected lines listed here run at 161 kV. Together the listed lines cover about 12.7 miles.

Who owns TAP149098 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP149098 belong to EMPIRE DISTRICT ELECTRIC CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP149098 substation located?

TAP149098 is in Missouri at 37.0011, -94.5322. The datacenter candidate sites closest to it are in Jasper County, Newton, Cherokee County.

Are there datacenter candidate sites near TAP149098 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP149098. The highest-scoring is UNKNOWN173548 at 63/100. Across Missouri, the average DC Readiness score is 55.7.

More in Missouri

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP149098 substation, Missouri”, https://gridcensus.com/substations/missouri/tap149098-af5ad69b (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP149098 substation, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.