Skip to content
Gridcensus

TAP138517

Substation

Missouri · UNION ELECTRIC CO - (MO)

Max voltage
161
kV

At a glance

TAP138517 is a 161 kV electric substation in Missouri on UNION ELECTRIC CO - (MO)'s transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is EC Near Alliant SBD 9402 Climax in Lee, with a DC Readiness score of 59/100.

TAP138517 is an electric transmission substation in Missouri, on UNION ELECTRIC CO - (MO)'s transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership

Line owner (most lines)UNION ELECTRIC CO - (MO)
Coordinates40.3919, -91.5936

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#128339161 kVUNION ELECTRIC CO - (MO)IN SERVICE10.2 mi
#136398161 kVUNION ELECTRIC CO - (MO)IN SERVICE39.0 mi
#149758161 kVUNION ELECTRIC CO - (MO)IN SERVICE2.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138517, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138517 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near Alliant SBD 9402 ClimaxGreenfieldIALee——4.3 yrs58.8
EC Near Alliant SBD 9402 ClimaxGreenfieldIALee——4.3 yrs58.4
OZ LeeGreenfieldIALee——4.3 yrs58.4
OZ LeeGreenfieldIALee——4.3 yrs57.9
EC Near Alliant SBD 9402 ClimaxGreenfieldIALee——4.3 yrs57.5
EC Near Alliant SBD 9402 ClimaxGreenfieldIALee——4.3 yrs57.5
EC Near Alliant SBD 9402 ClimaxGreenfieldIALee——4.3 yrs57.1
UNKNOWN159157Substation-AdjacentIALee County161 kV100 MW4.3 yrs57.0

Who owns the transmission lines at TAP138517?

The 3 connected lines listed above are owned by UNION ELECTRIC CO - (MO). Line voltages range from 161 kV to 161 kV. Their combined recorded length is about 51.7 miles.

How do candidate sites near TAP138517 score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 59 on the 0–100 DC Readiness scale. They fall in Lee, Lee County. The Missouri average across 3,413 scored sites is 55.7. 1,002 of those Missouri sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP138517 substation?

TAP138517 has a maximum voltage of 161 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP138517 is above the national midpoint.

How many transmission lines connect to TAP138517 substation?

3 transmission lines terminate at or pass through TAP138517 in the HIFLD line data. The connected lines listed here run at 161 kV. Together the listed lines cover about 51.7 miles.

Who owns TAP138517 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP138517 belong to UNION ELECTRIC CO - (MO). GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP138517 substation located?

TAP138517 is in Missouri at 40.3919, -91.5936. The datacenter candidate sites closest to it are in Lee, Lee County.

Are there datacenter candidate sites near TAP138517 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP138517. The highest-scoring is EC Near Alliant SBD 9402 Climax at 59/100. Across Missouri, the average DC Readiness score is 55.7.

More in Missouri

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP138517 substation, Missouri”, https://gridcensus.com/substations/missouri/tap138517-7a228770 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP138517 substation, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.