TAP144775

Substation

Mississippi

Max voltage
—
kV

TAP144775 is an electric transmission substation in Mississippi. It is classified as unclassified and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

Coordinates33.7056, -88.3171

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP144775, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP144775 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WESTPOINTSubstation-AdjacentMSClay County500 kV1,000 MW3.9 yrs70.3
LOWNDESSubstation-AdjacentMSLowndes County500 kV1,000 MW3.9 yrs67.6
CALEDONIASubstation-AdjacentMSLamar County500 kV1,000 MW3.9 yrs67.0
WEST VERNONSubstation-AdjacentALLamar County500 kV1,000 MW3.9 yrs66.9
UNKNOWN109567Substation-AdjacentMSLowndes County161 kV100 MW3.9 yrs62.5
Greenfield (WESTPOINT - BROWNS FERRY)GreenfieldMSClay County500 kV1,000 MW3.9 yrs62.5
UNKNOWN109565Substation-AdjacentMSLowndes County161 kV100 MW3.9 yrs62.5
TAP169476Substation-AdjacentMSLowndes County161 kV100 MW3.9 yrs62.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP144775 substation, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.