Skip to content
Gridcensus

REX BROWN 230KV

Substation

Mississippi

Max voltage
230
kV

REX BROWN 230KV is an electric transmission substation in Mississippi. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

Operator not catalogued for this substation.

Coordinates32.3603, -90.2166

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of REX BROWN 230KV, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near REX BROWN 230KV substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LAKEOVERSubstation-AdjacentMSHinds County500 kV1,000 MW2.8 yrs64.8
RAY BRASWELLSubstation-AdjacentMSHinds County500 kV1,000 MW2.8 yrs63.9
REX BROWN 230KVSubstation-AdjacentMSHinds County230 kV300 MW2.8 yrs62.8
UNKNOWN109667Substation-AdjacentMSMadison County230 kV300 MW2.8 yrs61.5
UNKNOWN110124Substation-AdjacentMSMadison County230 kV300 MW2.8 yrs61.2
YANDELL ROADSubstation-AdjacentMSMadison County230 kV300 MW2.8 yrs60.7
UNKNOWN109664Substation-AdjacentMSMadison County230 kV300 MW2.8 yrs60.6
BOZEMAN ROADSubstation-AdjacentMSMadison County230 kV300 MW2.8 yrs60.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for REX BROWN 230KV substation, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.