Skip to content
Gridcensus

MADISON, Mississippi · MISO

DC Readiness
60.2
Good / 100

BOZEMAN ROAD is a substation-adjacent datacenter candidate site in MADISON, Mississippi, interconnecting through MISO. It screens at 60.2/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBOZEMAN ROAD
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW

Speed to power

ISO / RTO regionMISO
Queue depth8
Avg queue wait2.8 yrs

Connectivity

Nearest IXPC Spire Mississippi
IXP distance102.2 mi
Fiber providers6
Fiber coverage86.5%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterAmazon Canton Data Center
DC distance6.3 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.03¢/kWh
Industrial electricity7.24¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,486

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
53
Fiber connectivity12%
44
Energy cost10%
50
Water risk8%
90
Natural hazard8%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in MADISON, ranked by DC Readiness.

Sites near BOZEMAN ROAD
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109667Substation-Adjacent230 kV300 MW2.8 yrs61.0
UNKNOWN110124Substation-Adjacent230 kV300 MW2.8 yrs61.0
YANDELL ROADSubstation-Adjacent230 kV300 MW2.8 yrs60.2
UNKNOWN109669Substation-Adjacent230 kV300 MW2.8 yrs60.2
UNKNOWN109664Substation-Adjacent230 kV300 MW2.8 yrs60.2
Greenfield (MCADAMS - LAKEOVER)Greenfield500 kV1,000 MW2.8 yrs58.3
Greenfield (RAY BRASWELL - LAKEOVER)Greenfield500 kV1,000 MW2.8 yrs58.3
SAND HILLSubstation-Adjacent161 kV100 MW2.8 yrs56.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BOZEMAN ROAD, MADISON. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.