CALEDONIA 500 KV SWITCHING YARD

Substation

Mississippi

Max voltage
500
kV

CALEDONIA 500 KV SWITCHING YARD is an electric transmission substation in Mississippi. It is classified as extra-high-voltage (500 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines4

Ownership & operation

Operator not catalogued for this substation.

Coordinates33.6486, -88.2721

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CALEDONIA 500 KV SWITCHING YARD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CALEDONIA 500 KV SWITCHING YARD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WESTPOINTSubstation-AdjacentMSClay County500 kV1,000 MW2.8 yrs68.4
WEST VERNONSubstation-AdjacentALLamar County500 kV1,000 MW1.0 yrs66.5
LOWNDESSubstation-AdjacentMSLowndes County500 kV1,000 MW2.8 yrs64.1
CALEDONIASubstation-AdjacentMSLamar County500 kV1,000 MW2.8 yrs63.6
UNKNOWN109567Substation-AdjacentMSLowndes County161 kV100 MW2.8 yrs60.9
EC Coal Lamar CountyGreenfieldALLamar County3.7 yrs60.6
UNKNOWN109565Substation-AdjacentMSLowndes County161 kV100 MW2.8 yrs60.5
TAP169476Substation-AdjacentMSLowndes County161 kV100 MW2.8 yrs60.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.