Skip to content
Gridcensus

TAP171052

Substation

Minnesota

Max voltage
—
kV

TAP171052 is an electric transmission substation in Minnesota. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates44.9629, -94.0535

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP171052, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP171052 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DICKINSONSubstation-AdjacentMNWright County400 kV600 MW4.3 yrs65.9
MONTICELLOSubstation-AdjacentMNSherburne County345 kV600 MW4.3 yrs64.2
UNKNOWN129735Substation-AdjacentMNMcLeod County230 kV300 MW4.3 yrs62.4
UNKNOWN129670Substation-AdjacentMNCarver County115 kV100 MW4.3 yrs62.1
UNKNOWN129675Substation-AdjacentMNCarver County115 kV100 MW4.3 yrs61.8
UNKNOWN130233Substation-AdjacentMNCarver County115 kV100 MW4.3 yrs61.7
EC Near GlencoeGreenfieldMNMcLeod——4.3 yrs61.1
EC Coal Wright CountyGreenfieldMNWright County——4.3 yrs60.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP171052 substation, Minnesota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.