TAP170728
SubstationMinnesota
TAP170728 is an electric transmission substation in Minnesota. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP170728, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN130772 | Substation-Adjacent | MN | Hubbard County | 115 kV | 100 MW | 4.3 yrs | 57.0 |
| EC Coal Cass County | Greenfield | MN | Cass County | — | — | 4.3 yrs | 56.4 |
| PEQUOT LAKES | Substation-Adjacent | MN | Crow Wing County | 115 kV | 100 MW | 4.3 yrs | 56.4 |
| UNKNOWN129728 | Substation-Adjacent | MN | Cass County | 115 kV | 100 MW | 4.3 yrs | 55.1 |
| Greenfield (BADOURA 230/115 KV - RIVERTON ) | Greenfield | MN | Crow Wing County | 230 kV | 300 MW | 4.3 yrs | 55.0 |
| TAP136165 | Substation-Adjacent | MN | Crow Wing County | 69 kV | 50 MW | 4.3 yrs | 54.4 |
| UNKNOWN161638 | Substation-Adjacent | MN | Crow Wing County | 69 kV | 50 MW | 4.3 yrs | 54.1 |
| EMILY 3 | Substation-Adjacent | MN | Crow Wing County | 69 kV | 50 MW | 4.3 yrs | 53.8 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP170728 substation, Minnesota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.