TAP139683
SubstationMinnesota
TAP139683 is an electric transmission substation in Minnesota. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP139683, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SHERBURNE COUNTY | Substation-Adjacent | MN | Sherburne County | 345 kV | 600 MW | 4.3 yrs | 67.9 |
| DICKINSON | Substation-Adjacent | MN | Wright County | 400 kV | 600 MW | 4.3 yrs | 65.9 |
| MONTICELLO | Substation-Adjacent | MN | Sherburne County | 345 kV | 600 MW | 4.3 yrs | 64.2 |
| UNKNOWN170707 | Substation-Adjacent | MN | Carver County | 115 kV | 100 MW | 4.3 yrs | 62.6 |
| UNKNOWN129735 | Substation-Adjacent | MN | McLeod County | 230 kV | 300 MW | 4.3 yrs | 62.4 |
| UNKNOWN129670 | Substation-Adjacent | MN | Carver County | 115 kV | 100 MW | 4.3 yrs | 62.1 |
| UNKNOWN129675 | Substation-Adjacent | MN | Carver County | 115 kV | 100 MW | 4.3 yrs | 61.8 |
| Greenfield (UNKNOWN129735 - BLUE LAKE) | Greenfield | MN | Carver County | 230 kV | 300 MW | 4.3 yrs | 61.7 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP139683 substation, Minnesota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.