Skip to content
Gridcensus

TAP138578

Substation

Minnesota

Max voltage
69
kV

TAP138578 is an electric transmission substation in Minnesota. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates44.2257, -93.3434

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138578, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138578 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HELENASubstation-AdjacentMNScott County345 kV600 MW4.3 yrs67.8
CHUB LAKESubstation-AdjacentMNScott County345 kV600 MW4.3 yrs67.1
UNKNOWN132021Substation-AdjacentMNLe Sueur County345 kV600 MW4.3 yrs67.0
OZ WasecaGreenfieldMNWaseca——4.3 yrs64.5
UNKNOWN129423Substation-AdjacentMNSteele County161 kV100 MW4.3 yrs64.4
EC Near OwatonnaGreenfieldMNSteele——4.3 yrs64.1
EC Near MontgomeryGreenfieldMNLe Sueur——4.3 yrs63.6
EC Near OwatonnaGreenfieldMNSteele——4.3 yrs63.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP138578 substation, Minnesota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.