At a glance

TAP161568 is a 69 kV electric substation in Michigan, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is EC Coal Delta County in Delta County, with a DC Readiness score of 61/100.

TAP161568 is an electric transmission substation in Michigan. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

No owner is recorded for the lines that connect here.

Coordinates45.8019, -87.0896

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#15881569 kV—IN SERVICE4.5 mi
#16127069 kV—IN SERVICE0.9 mi
#16127169 kV—IN SERVICE0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP161568, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP161568 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Coal Delta CountyGreenfieldMIDelta County——2.2 yrs61.0
EC Coal Delta CountyGreenfieldMIDelta County——2.2 yrs60.4
EC Coal Delta CountyGreenfieldMIDelta County——2.2 yrs60.4
OZ MenomineeGreenfieldMIMenominee——2.2 yrs58.4
CHANDLERSubstation-AdjacentMIDelta County138 kV100 MW2.2 yrs58.3
ATC PERKINSSubstation-AdjacentMIDelta County138 kV100 MW2.2 yrs58.2
EC Coal Delta CountyGreenfieldMIDelta County——2.2 yrs57.9
EC Coal Delta CountyGreenfieldMIDelta County——2.2 yrs57.0

How do candidate sites near TAP161568 score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 61 on the 0–100 DC Readiness scale. They fall in Delta County, Menominee. The Michigan average across 5,157 scored sites is 55.2. 768 of those Michigan sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP161568 substation?

TAP161568 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP161568 is below the national midpoint.

How many transmission lines connect to TAP161568 substation?

3 transmission lines terminate at or pass through TAP161568 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 5.6 miles.

Where is TAP161568 substation located?

TAP161568 is in Michigan at 45.8019, -87.0896. The datacenter candidate sites closest to it are in Delta County, Menominee.

Are there datacenter candidate sites near TAP161568 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP161568. The highest-scoring is EC Coal Delta County at 61/100. Across Michigan, the average DC Readiness score is 55.2.

More in Michigan

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP161568 substation, Michigan”, https://gridcensus.com/substations/michigan/tap161568-f2cce7cc (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP161568 substation, Michigan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.