TAP159028
SubstationMichigan · WOLVERINE PWR SUPPLY COOP, INC
At a glance
TAP159028 is an electric transmission substation in Michigan, on WOLVERINE PWR SUPPLY COOP, INC's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #159982 | 69 kV | — | IN SERVICE | 3.3 mi |
| #159983 | 69 kV | WOLVERINE PWR SUPPLY COOP, INC | IN SERVICE | 10.5 mi |
| #159984 | 69 kV | — | IN SERVICE | 0.0 mi |
| #159985 | 69 kV | — | IN SERVICE | 0.0 mi |
| #159986 | 69 kV | — | IN SERVICE | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP159028, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| EC Near Gaylord - Consumers | Greenfield | MI | Otsego | — | — | 2.2 yrs | 59.2 |
| TAP143810 | Substation-Adjacent | MI | Cheboygan County | 138 kV | 100 MW | 2.2 yrs | 58.3 |
| UNKNOWN128880 | Substation-Adjacent | MI | Otsego County | 138 kV | 100 MW | 2.2 yrs | 58.3 |
| TAP143808 | Substation-Adjacent | MI | Otsego County | 138 kV | 100 MW | 2.2 yrs | 58.2 |
| UNKNOWN143811 | Substation-Adjacent | MI | Cheboygan County | 138 kV | 100 MW | 2.2 yrs | 58.1 |
| RIGGSVILLE | Substation-Adjacent | MI | Cheboygan County | 138 kV | 100 MW | 2.2 yrs | 58.1 |
| UNKNOWN128859 | Substation-Adjacent | MI | Emmet County | 138 kV | 100 MW | 2.2 yrs | 58.0 |
| UNKNOWN128860 | Substation-Adjacent | MI | Emmet County | 138 kV | 100 MW | 2.2 yrs | 57.9 |
Who owns the transmission lines at TAP159028?
The 5 connected lines listed above are owned by WOLVERINE PWR SUPPLY COOP, INC. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 13.9 miles.
How do candidate sites near TAP159028 score?
The 8 highest-scoring candidate sites within about 25 miles range from 58 to 59 on the 0–100 DC Readiness scale. They fall in Otsego, Cheboygan County, Otsego County, Emmet County. The Michigan average across 5,157 scored sites is 55.2. 768 of those Michigan sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP159028 substation?
TAP159028 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP159028 is below the national midpoint.
How many transmission lines connect to TAP159028 substation?
3 transmission lines terminate at or pass through TAP159028 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 13.9 miles.
Who owns TAP159028 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP159028 belong to WOLVERINE PWR SUPPLY COOP, INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP159028 substation located?
TAP159028 is in Michigan at 45.4635, -84.9206. The datacenter candidate sites closest to it are in Otsego, Cheboygan County, Otsego County.
Are there datacenter candidate sites near TAP159028 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP159028. The highest-scoring is EC Near Gaylord - Consumers at 59/100. Across Michigan, the average DC Readiness score is 55.2.
More in Michigan
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP159028 substation, Michigan”, https://gridcensus.com/substations/michigan/tap159028-a3815f67 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP159028 substation, Michigan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.