TAP156014
SubstationMichigan · INDIANA MICHIGAN POWER CO
At a glance
TAP156014 is an electric transmission substation in Michigan, on INDIANA MICHIGAN POWER CO's transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #121759 | 138 kV | INDIANA MICHIGAN POWER CO | IN SERVICE | 0.1 mi |
| #139730 | 138 kV | INDIANA MICHIGAN POWER CO | IN SERVICE | 9.5 mi |
| #149136 | 138 kV | INDIANA MICHIGAN POWER CO | IN SERVICE | 1.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP156014, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| OLIVE | Substation-Adjacent | IN | St. Joseph County | 345 kV | 600 MW | 3.0 yrs | 70.9 |
| KENZIE CREEK | Substation-Adjacent | MI | Cass County | 345 kV | 600 MW | 2.2 yrs | 68.4 |
| COOK | Substation-Adjacent | MI | Berrien County | 765 kV | 1,000 MW | 2.2 yrs | 67.7 |
| DUMONT | Substation-Adjacent | IN | St. Joseph County | 765 kV | 1,000 MW | 3.0 yrs | 67.7 |
| JACKSON ROAD | Substation-Adjacent | IN | St. Joseph County | 345 kV | 600 MW | 3.0 yrs | 67.0 |
| TAP138974 | Substation-Adjacent | IN | Elkhart County | 345 kV | 600 MW | 3.0 yrs | 66.7 |
| BENTON HARBOR | Substation-Adjacent | MI | Van Buren County | 345 kV | 600 MW | 2.2 yrs | 66.1 |
| TWIN BRANCH (345 KV) | Substation-Adjacent | IN | St. Joseph County | 345 kV | 600 MW | 3.0 yrs | 66.0 |
Who owns the transmission lines at TAP156014?
The 3 connected lines listed above are owned by INDIANA MICHIGAN POWER CO. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 10.6 miles.
How do candidate sites near TAP156014 score?
The 8 highest-scoring candidate sites within about 25 miles range from 66 to 71 on the 0–100 DC Readiness scale. They fall in St. Joseph County, Cass County, Berrien County, Elkhart County. The Michigan average across 5,157 scored sites is 55.2. 768 of those Michigan sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP156014 substation?
TAP156014 has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP156014 is above the national midpoint.
How many transmission lines connect to TAP156014 substation?
3 transmission lines terminate at or pass through TAP156014 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 10.6 miles.
Who owns TAP156014 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP156014 belong to INDIANA MICHIGAN POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP156014 substation located?
TAP156014 is in Michigan at 41.8872, -86.1878. The datacenter candidate sites closest to it are in St. Joseph County, Cass County, Berrien County.
Are there datacenter candidate sites near TAP156014 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP156014. The highest-scoring is OLIVE at 71/100. Across Michigan, the average DC Readiness score is 55.2.
More in Michigan
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP156014 substation, Michigan”, https://gridcensus.com/substations/michigan/tap156014-5face390 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP156014 substation, Michigan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.