TAP139992

Substation

Michigan

Max voltage
345
kV

TAP139992 is an electric transmission substation in Michigan. It is classified as high-voltage (345 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

Coordinates42.8683, -82.6898

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139992, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139992 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN128399Substation-AdjacentMIMacomb County345 kV600 MW3.8 yrs67.4
UNKNOWN128466Substation-AdjacentMIMacomb County345 kV600 MW3.8 yrs66.5
OZ MacombGreenfieldMIMacomb2.2 yrs65.5
OZ MacombGreenfieldMIMacomb2.2 yrs65.4
OZ MacombGreenfieldMIMacomb2.2 yrs65.2
UNKNOWN128512Substation-AdjacentMIMacomb County345 kV600 MW3.8 yrs65.1
OZ MacombGreenfieldMIMacomb2.2 yrs64.7
DEADEND167215Substation-AdjacentMIMacomb County345 kV600 MW3.8 yrs64.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP139992 substation, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.