TAP139988

Substation

Michigan

Max voltage
230
kV

TAP139988 is an electric transmission substation in Michigan. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates42.2698, -83.2057

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139988, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139988 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Conners CreekBrownfieldMIWayne County275 MW2.2 yrs69.2
WAYNESubstation-AdjacentMIWayne County345 kV600 MW3.8 yrs68.0
UNKNOWN128399Substation-AdjacentMIMacomb County345 kV600 MW3.8 yrs67.4
EC Near River RougeGreenfieldMIWayne2.2 yrs66.6
OZ WayneGreenfieldMIWayne2.2 yrs66.6
UNKNOWN128466Substation-AdjacentMIMacomb County345 kV600 MW3.8 yrs66.5
OZ WayneGreenfieldMIWayne2.2 yrs66.3
OZ WayneGreenfieldMIWayne2.2 yrs66.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP139988 substation, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.