Skip to content
Gridcensus

TAP139983

Substation

Michigan · WYANDOTTE MUNICIPAL SERV COMM

Max voltage
120
kV

At a glance

TAP139983 is a 120 kV electric substation in Michigan on WYANDOTTE MUNICIPAL SERV COMM's transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN128399 in Macomb County, with a DC Readiness score of 69/100.

TAP139983 is an electric transmission substation in Michigan, on WYANDOTTE MUNICIPAL SERV COMM's transmission network. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage120 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership

Line owner (most lines)WYANDOTTE MUNICIPAL SERV COMM
Coordinates42.4504, -82.9417

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#125641120 kV——0.4 mi
#126124120 kVWYANDOTTE MUNICIPAL SERV COMMIN SERVICE5.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139983, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139983 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN128399Substation-AdjacentMIMacomb County345 kV600 MW2.2 yrs69.1
UNKNOWN128466Substation-AdjacentMIMacomb County345 kV600 MW2.2 yrs68.5
SENECASubstation-AdjacentMIMacomb County345 kV600 MW2.2 yrs68.2
UNKNOWN128507Substation-AdjacentMIOakland County345 kV600 MW2.2 yrs68.0
Conners CreekBrownfieldMIWayne County—275 MW2.2 yrs68.0
UNKNOWN128451Substation-AdjacentMIWayne County230 kV300 MW2.2 yrs67.7
UNKNOWN128512Substation-AdjacentMIMacomb County345 kV600 MW2.2 yrs67.6
BROWNSTOWNSubstation-AdjacentMIWayne County345 kV600 MW2.2 yrs67.4

Who owns the transmission lines at TAP139983?

The 2 connected lines listed above are owned by WYANDOTTE MUNICIPAL SERV COMM. Line voltages range from 120 kV to 120 kV. Their combined recorded length is about 5.7 miles.

How do candidate sites near TAP139983 score?

The 8 highest-scoring candidate sites within about 25 miles range from 67 to 69 on the 0–100 DC Readiness scale. They fall in Macomb County, Oakland County, Wayne County. The Michigan average across 5,157 scored sites is 55.2. 768 of those Michigan sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP139983 substation?

TAP139983 has a maximum voltage of 120 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP139983 is above the national midpoint.

How many transmission lines connect to TAP139983 substation?

2 transmission lines terminate at or pass through TAP139983 in the HIFLD line data. The connected lines listed here run at 120 kV. Together the listed lines cover about 5.7 miles.

Who owns TAP139983 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP139983 belong to WYANDOTTE MUNICIPAL SERV COMM. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP139983 substation located?

TAP139983 is in Michigan at 42.4504, -82.9417. The datacenter candidate sites closest to it are in Macomb County, Oakland County, Wayne County.

Are there datacenter candidate sites near TAP139983 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP139983. The highest-scoring is UNKNOWN128399 at 69/100. Across Michigan, the average DC Readiness score is 55.2.

More in Michigan

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP139983 substation, Michigan”, https://gridcensus.com/substations/michigan/tap139983-1e5db41c (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP139983 substation, Michigan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.