Substation

Michigan · CONSUMERS ENERGY CO

Max voltage
138
kV

At a glance

TAP139918 is a 138 kV electric substation in Michigan on CONSUMERS ENERGY CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is EC Near Eckert Station in Ingham, with a DC Readiness score of 67/100.

TAP139918 is an electric transmission substation in Michigan, on CONSUMERS ENERGY CO's transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership

Line owner (most lines)CONSUMERS ENERGY CO
Coordinates42.7557, -84.3834

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#109029138 kVCONSUMERS ENERGY COIN SERVICE1.9 mi
#146135138 kVCONSUMERS ENERGY COIN SERVICE1.9 mi
#150340138 kVCONSUMERS ENERGY COIN SERVICE14.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139918, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139918 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near Eckert StationGreenfieldMIIngham——2.2 yrs66.6
UNKNOWN128990Substation-AdjacentMIIngham County138 kV100 MW2.2 yrs66.5
Burcham Park LandfillBrownfieldMIIngham138 kV0 MW2.2 yrs66.4
EC Coal Ingham CountyGreenfieldMIIngham County——2.2 yrs66.3
TOMPKINSSubstation-AdjacentMIJackson County345 kV600 MW2.2 yrs65.7
EC Near Eckert StationGreenfieldMIIngham——2.2 yrs65.7
EC Coal Eaton CountyGreenfieldMIEaton County——2.2 yrs65.5
EC Coal Eaton CountyGreenfieldMIEaton County——2.2 yrs65.5

Who owns the transmission lines at TAP139918?

The 3 connected lines listed above are owned by CONSUMERS ENERGY CO. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 18.4 miles.

How do candidate sites near TAP139918 score?

The 8 highest-scoring candidate sites within about 25 miles range from 66 to 67 on the 0–100 DC Readiness scale. They fall in Ingham, Ingham County, Jackson County, Eaton County. The Michigan average across 5,157 scored sites is 55.2. 768 of those Michigan sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP139918 substation?

TAP139918 has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP139918 is above the national midpoint.

How many transmission lines connect to TAP139918 substation?

3 transmission lines terminate at or pass through TAP139918 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 18.4 miles.

Who owns TAP139918 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP139918 belong to CONSUMERS ENERGY CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP139918 substation located?

TAP139918 is in Michigan at 42.7557, -84.3834. The datacenter candidate sites closest to it are in Ingham, Ingham County, Jackson County.

Are there datacenter candidate sites near TAP139918 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP139918. The highest-scoring is EC Near Eckert Station at 67/100. Across Michigan, the average DC Readiness score is 55.2.

More in Michigan

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP139918 substation, Michigan”, https://gridcensus.com/substations/michigan/tap139918-1936479a (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP139918 substation, Michigan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.