TAP139549 is an electric transmission substation in Michigan. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates45.8014, -87.9736

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139549, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139549 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PLAINSSubstation-AdjacentMIDickinson County345 kV600 MW2.2 yrs63.4
WHITE RAPIDS HYSubstation-AdjacentMIMarinette County138 kV100 MW2.2 yrs57.8
UNKNOWN129052Substation-AdjacentMIDickinson County138 kV100 MW2.2 yrs57.6
AMBERGSubstation-AdjacentWIMarinette County138 kV100 MW4.3 yrs57.2
CHALK HILLS HYSubstation-AdjacentMIMenominee County138 kV100 MW2.2 yrs57.1
NORDICSubstation-AdjacentMIDickinson County138 kV100 MW2.2 yrs57.1
NIAGRA PAPER OF WISCONSINSubstation-AdjacentWIDickinson County138 kV100 MW4.3 yrs56.3
SAGOLASubstation-AdjacentMIDickinson County69 kV50 MW2.2 yrs55.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP139549 substation, Michigan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.