TAP138716

Substation

Michigan · WYANDOTTE MUNICIPAL SERV COMM

Max voltage
120
kV

At a glance

TAP138716 is a 120 kV electric substation in Michigan on WYANDOTTE MUNICIPAL SERV COMM's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is WAYNE in Wayne County, with a DC Readiness score of 69/100.

TAP138716 is an electric transmission substation in Michigan, on WYANDOTTE MUNICIPAL SERV COMM's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage120 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)WYANDOTTE MUNICIPAL SERV COMM
Coordinates42.3096, -83.5323

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#107415120 kV—IN SERVICE3.5 mi
#125084120 kVWYANDOTTE MUNICIPAL SERV COMMIN SERVICE1.2 mi
#129016120 kV—IN SERVICE6.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138716, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138716 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WAYNESubstation-AdjacentMIWayne County345 kV600 MW2.2 yrs69.4
MILANSubstation-AdjacentMIWashtenaw County345 kV600 MW2.2 yrs68.2
WIXOMSubstation-AdjacentMIOakland County345 kV600 MW2.2 yrs68.1
COVENTRYSubstation-AdjacentMIWashtenaw County345 kV600 MW2.2 yrs67.9
BROWNSTOWNSubstation-AdjacentMIWayne County345 kV600 MW2.2 yrs67.4
DEADEND167207Substation-AdjacentMIMonroe County345 kV600 MW2.2 yrs66.9
UNKNOWN128894Substation-AdjacentMIWayne County230 kV300 MW2.2 yrs66.8
TAP139995Substation-AdjacentMIWayne County230 kV300 MW2.2 yrs66.7

Who owns the transmission lines at TAP138716?

The 3 connected lines listed above are owned by WYANDOTTE MUNICIPAL SERV COMM. Line voltages range from 120 kV to 120 kV. Their combined recorded length is about 11.6 miles.

How do candidate sites near TAP138716 score?

The 8 highest-scoring candidate sites within about 25 miles range from 67 to 69 on the 0–100 DC Readiness scale. They fall in Wayne County, Washtenaw County, Oakland County, Monroe County. The Michigan average across 5,157 scored sites is 55.2. 768 of those Michigan sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP138716 substation?

TAP138716 has a maximum voltage of 120 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP138716 is above the national midpoint.

How many transmission lines connect to TAP138716 substation?

3 transmission lines terminate at or pass through TAP138716 in the HIFLD line data. The connected lines listed here run at 120 kV. Together the listed lines cover about 11.6 miles.

Who owns TAP138716 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP138716 belong to WYANDOTTE MUNICIPAL SERV COMM. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP138716 substation located?

TAP138716 is in Michigan at 42.3096, -83.5323. The datacenter candidate sites closest to it are in Wayne County, Washtenaw County, Oakland County.

Are there datacenter candidate sites near TAP138716 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP138716. The highest-scoring is WAYNE at 69/100. Across Michigan, the average DC Readiness score is 55.2.

More in Michigan

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP138716 substation, Michigan”, https://gridcensus.com/substations/michigan/tap138716-982d1901 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP138716 substation, Michigan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.