TAP137297
SubstationMichigan
At a glance
TAP137297 is an electric transmission substation in Michigan. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
No owner is recorded for the lines that connect here.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #109210 | 120 kV | — | IN SERVICE | 9.4 mi |
| #112995 | 120 kV | — | IN SERVICE | 0.0 mi |
| #141051 | 120 kV | — | IN SERVICE | 1.9 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP137297, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| WAYNE | Substation-Adjacent | MI | Wayne County | 345 kV | 600 MW | 2.2 yrs | 69.4 |
| MILAN | Substation-Adjacent | MI | Washtenaw County | 345 kV | 600 MW | 2.2 yrs | 68.2 |
| WIXOM | Substation-Adjacent | MI | Oakland County | 345 kV | 600 MW | 2.2 yrs | 68.1 |
| COVENTRY | Substation-Adjacent | MI | Washtenaw County | 345 kV | 600 MW | 2.2 yrs | 67.9 |
| DEADEND167207 | Substation-Adjacent | MI | Monroe County | 345 kV | 600 MW | 2.2 yrs | 66.9 |
| MAJESTIC | Substation-Adjacent | MI | Washtenaw County | 345 kV | 600 MW | 2.2 yrs | 66.5 |
| TAP137284 | Substation-Adjacent | MI | Monroe County | 345 kV | 600 MW | 2.2 yrs | 66.1 |
| EC Near University of Michigan | Greenfield | MI | Washtenaw | — | — | 2.2 yrs | 65.5 |
How do candidate sites near TAP137297 score?
The 8 highest-scoring candidate sites within about 25 miles range from 66 to 69 on the 0–100 DC Readiness scale. They fall in Wayne County, Washtenaw County, Oakland County, Monroe County. The Michigan average across 5,157 scored sites is 55.2. 768 of those Michigan sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP137297 substation?
TAP137297 has a maximum voltage of 120 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP137297 is above the national midpoint.
How many transmission lines connect to TAP137297 substation?
3 transmission lines terminate at or pass through TAP137297 in the HIFLD line data. The connected lines listed here run at 120 kV. Together the listed lines cover about 11.4 miles.
Where is TAP137297 substation located?
TAP137297 is in Michigan at 42.2836, -83.8238. The datacenter candidate sites closest to it are in Wayne County, Washtenaw County, Oakland County.
Are there datacenter candidate sites near TAP137297 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP137297. The highest-scoring is WAYNE at 69/100. Across Michigan, the average DC Readiness score is 55.2.
More in Michigan
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP137297 substation, Michigan”, https://gridcensus.com/substations/michigan/tap137297-64cedeab (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP137297 substation, Michigan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.