Skip to content
Gridcensus

RACO

Substation

Michigan

Max voltage
69
kV

At a glance

RACO is a 69 kV electric substation in Michigan, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. 150 of Michigan's 277 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is EC Near Dafter in Chippewa, with a DC Readiness score of 58/100.

RACO is an electric transmission substation in Michigan. It is classified as distribution (69–115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines1

Ownership

No owner is recorded for the lines that connect here.

Coordinates46.3596, -84.8020

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#17355569 kV—IN SERVICE1.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RACO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RACO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near DafterGreenfieldMIChippewa——2.2 yrs57.8
EC FFE Chippewa CountyGreenfieldMIChippewa County——2.2 yrs57.4
TAP138458Substation-AdjacentMIMackinac County138 kV100 MW2.2 yrs57.3
TAP171274Substation-AdjacentMIMackinac County69 kV50 MW2.2 yrs55.9
EC Near DafterGreenfieldMIChippewa——2.2 yrs55.6
HULBERTSubstation-AdjacentMIMackinac County69 kV50 MW2.2 yrs55.5
EC Near DafterGreenfieldMIChippewa——2.2 yrs55.4
ECKERMANSubstation-AdjacentMIMackinac County69 kV50 MW2.2 yrs55.1

How does RACO compare with other substations in Michigan?

Michigan has 1,880 substation records in HIFLD, of which 277 carry a station name; the rest are unnamed tap points, risers and line ends. 89 named substations in the state are in RACO's 69–114 kV band (32% of named stations). 150 sit in a higher band. 43 named substations in Michigan operate at 345 kV or above. The highest voltage recorded in the state is 765 kV, and the state median is 138 kV.

How do candidate sites near RACO score?

The 8 highest-scoring candidate sites within about 25 miles range from 55 to 58 on the 0–100 DC Readiness scale. They fall in Chippewa, Chippewa County, Mackinac County. The Michigan average across 5,157 scored sites is 55.2. 768 of those Michigan sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is RACO substation?

RACO has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so RACO is below the national midpoint.

How many transmission lines connect to RACO substation?

1 transmission line terminate at or pass through RACO in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 1.1 miles.

Where is RACO substation located?

RACO is in Michigan at 46.3596, -84.8020. The datacenter candidate sites closest to it are in Chippewa, Chippewa County, Mackinac County.

Are there datacenter candidate sites near RACO substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of RACO. The highest-scoring is EC Near Dafter at 58/100. Across Michigan, the average DC Readiness score is 55.2.

Other 69 kV substations in Michigan

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “RACO substation, Michigan”, https://gridcensus.com/substations/michigan/raco-178e3c8a (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for RACO substation, Michigan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.