NORTHBORO ROAD

Substation

Massachusetts · FITCHBURG GAS AND ELECTRIC LIGHT COMPANY

Max voltage
115
kV

At a glance

NORTHBORO ROAD is a 115 kV electric substation in Massachusetts on FITCHBURG GAS AND ELECTRIC LIGHT COMPANY's transmission network, recorded in the HIFLD transmission dataset. 6 transmission lines connect to it. 39 of Massachusetts's 229 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN133682 in Middlesex County, with a DC Readiness score of 68/100.

NORTHBORO ROAD is an electric transmission substation in Massachusetts, on FITCHBURG GAS AND ELECTRIC LIGHT COMPANY's transmission network. It is classified as sub-transmission (115 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage69 kV
Voltage classSub-transmission (115 kV)
Connected lines6

Ownership

Coordinates42.3152, -71.5715

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#139073115 kVFITCHBURG GAS AND ELECTRIC LIGHT COMPANYIN SERVICE4.8 mi
#139765115 kVFITCHBURG GAS AND ELECTRIC LIGHT COMPANYIN SERVICE6.4 mi
#144202115 kVFITCHBURG GAS AND ELECTRIC LIGHT COMPANYIN SERVICE2.7 mi
#148728115 kVFITCHBURG GAS AND ELECTRIC LIGHT COMPANYIN SERVICE8.2 mi
#11511969 kVFITCHBURG GAS AND ELECTRIC LIGHT COMPANYIN SERVICE4.1 mi
#17266369 kVFITCHBURG GAS AND ELECTRIC LIGHT COMPANYIN SERVICE1.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NORTHBORO ROAD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NORTHBORO ROAD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN133682Substation-AdjacentMAMiddlesex County450 kV600 MW4.3 yrs68.3
TEWKSBURY NO. 22ASubstation-AdjacentMAMiddlesex County345 kV600 MW4.3 yrs67.2
WEST FARNUMSubstation-AdjacentRIProvidence County345 kV600 MW4.3 yrs67.2
LEXINGTONSubstation-AdjacentMAMiddlesex County345 kV600 MW4.3 yrs67.0
WALTHAMSubstation-AdjacentMAMiddlesex County230 kV300 MW4.3 yrs66.3
WEST WALPOLESubstation-AdjacentMANorfolk County345 kV600 MW4.3 yrs66.1
UNKNOWN132928Substation-AdjacentMANorfolk County345 kV600 MW4.3 yrs65.7
WEST MEDWAYSubstation-AdjacentMANorfolk County345 kV600 MW4.3 yrs65.7

How does NORTHBORO ROAD compare with other substations in Massachusetts?

Massachusetts has 612 substation records in HIFLD, of which 229 carry a station name; the rest are unnamed tap points, risers and line ends. 144 named substations in the state are in NORTHBORO ROAD's 115–229 kV band (63% of named stations). 39 sit in a higher band. 31 named substations in Massachusetts operate at 345 kV or above. The highest voltage recorded in the state is 345 kV, and the state median is 115 kV.

Who owns the transmission lines at NORTHBORO ROAD?

The 6 connected lines listed above are owned by FITCHBURG GAS AND ELECTRIC LIGHT COMPANY. Line voltages range from 69 kV to 115 kV. Their combined recorded length is about 28 miles.

How do candidate sites near NORTHBORO ROAD score?

The 8 highest-scoring candidate sites within about 25 miles range from 66 to 68 on the 0–100 DC Readiness scale. They fall in Middlesex County, Providence County, Norfolk County. The Massachusetts average across 1,861 scored sites is 54.2. 305 of those Massachusetts sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is NORTHBORO ROAD substation?

NORTHBORO ROAD has a maximum voltage of 115 kV and a minimum of 69 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so NORTHBORO ROAD is at the national midpoint.

How many transmission lines connect to NORTHBORO ROAD substation?

6 transmission lines terminate at or pass through NORTHBORO ROAD in the HIFLD line data. The connected lines listed here run at 115 kV, 69 kV. Together the listed lines cover about 28 miles.

Who owns NORTHBORO ROAD substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at NORTHBORO ROAD belong to FITCHBURG GAS AND ELECTRIC LIGHT COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is NORTHBORO ROAD substation located?

NORTHBORO ROAD is in Massachusetts at 42.3152, -71.5715. The datacenter candidate sites closest to it are in Middlesex County, Providence County, Norfolk County.

Are there datacenter candidate sites near NORTHBORO ROAD substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of NORTHBORO ROAD. The highest-scoring is UNKNOWN133682 at 68/100. Across Massachusetts, the average DC Readiness score is 54.2.

Other 115 kV substations in Massachusetts

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “NORTHBORO ROAD substation, Massachusetts”, https://gridcensus.com/substations/massachusetts/northboro-road-830be361 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for NORTHBORO ROAD substation, Massachusetts is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.