MILLBURY NO. 3

Substation

Massachusetts

Max voltage
345
kV

MILLBURY NO. 3 is an electric transmission substation in Massachusetts. It is classified as high-voltage (345 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines6

Ownership & operation

Operator not catalogued for this substation.

Coordinates42.1880, -71.7375

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MILLBURY NO. 3, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MILLBURY NO. 3 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN133682Substation-AdjacentMAMiddlesex County450 kV600 MW3.9 yrs66.4
WEST FARNUMSubstation-AdjacentRIProvidence County345 kV600 MW3.9 yrs65.3
WEST MEDWAYSubstation-AdjacentMANorfolk County345 kV600 MW3.9 yrs63.6
EC Near Central Power PlantGreenfieldRIProvidence3.5 yrs63.6
Ridgewood Providence PowerBrownfieldRIProvidence115 kV20 MW3.9 yrs63.5
SUDBURYSubstation-AdjacentMAMiddlesex County230 kV300 MW3.9 yrs63.5
KILLINGLYSubstation-AdjacentCTNortheastern Connecticut Planning Region345 kV600 MW3.9 yrs63.3
UNKNOWN132928Substation-AdjacentMANorfolk County345 kV600 MW3.9 yrs63.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MILLBURY NO. 3 substation, Massachusetts. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.