Skip to content
Gridcensus

BEAR SWAMP

Substation

Massachusetts

Max voltage
230
kV

BEAR SWAMP is an electric transmission substation in Massachusetts. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage69 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

Operator not catalogued for this substation.

Coordinates42.6841, -72.9499

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BEAR SWAMP, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BEAR SWAMP substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ BenningtonGreenfieldVTBennington3.5 yrs60.8
OZ HampshireGreenfieldMAHampshire3.5 yrs59.9
UNKNOWN132814Substation-AdjacentVTWindham County345 kV600 MW3.9 yrs59.7
OZ WindhamGreenfieldVTWindham3.5 yrs58.0
Pittsfield Municipal LandfillBrownfieldMABerkshire3 MW3.9 yrs57.5
North Adams LandfillBrownfieldMABerkshire4 MW3.9 yrs57.3
OZ BenningtonGreenfieldVTBennington3.5 yrs57.0
OZ BerkshireGreenfieldMABerkshire3.5 yrs56.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BEAR SWAMP substation, Massachusetts. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.