DEADEND167018
SubstationLouisiana · ENTERGY MISSISSIPPI INC
At a glance
DEADEND167018 is an electric transmission substation in Louisiana, on ENTERGY MISSISSIPPI INC's transmission network. It is classified as unclassified and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #100037 | — | ENTERGY MISSISSIPPI INC | — | 1.9 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of DEADEND167018, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| OZ Concordia | Greenfield | LA | Concordia | — | — | 4.3 yrs | 57.5 |
| UNKNOWN110841 | Substation-Adjacent | MS | Franklin County | 115 kV | 100 MW | 4.3 yrs | 54.7 |
| NATCHEZ | Substation-Adjacent | MS | Adams County | 115 kV | 100 MW | 4.3 yrs | 54.5 |
| UNKNOWN110665 | Substation-Adjacent | MS | Adams County | 115 kV | 100 MW | 4.3 yrs | 54.3 |
| EC Near Natchez | Greenfield | MS | Adams | — | — | 4.3 yrs | 54.3 |
| EC FFE Adams County | Greenfield | MS | Adams County | — | — | 4.3 yrs | 54.2 |
| UNKNOWN110662 | Substation-Adjacent | MS | Adams County | 115 kV | 100 MW | 4.3 yrs | 54.2 |
| UNKNOWN110664 | Substation-Adjacent | MS | Adams County | 115 kV | 100 MW | 4.3 yrs | 54.2 |
Who owns the transmission lines at DEADEND167018?
The 1 connected line listed above is owned by ENTERGY MISSISSIPPI INC. Their combined recorded length is about 1.9 miles.
How do candidate sites near DEADEND167018 score?
The 8 highest-scoring candidate sites within about 25 miles range from 54 to 58 on the 0–100 DC Readiness scale. They fall in Concordia, Franklin County, Adams County, Adams. The Louisiana average across 1,762 scored sites is 53.1. 615 of those Louisiana sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
How many transmission lines connect to DEADEND167018 substation?
1 transmission line terminate at or pass through DEADEND167018 in the HIFLD line data. Together the listed lines cover about 1.9 miles.
Who owns DEADEND167018 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at DEADEND167018 belong to ENTERGY MISSISSIPPI INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is DEADEND167018 substation located?
DEADEND167018 is in Louisiana at 31.5492, -91.4539. The datacenter candidate sites closest to it are in Concordia, Franklin County, Adams County.
Are there datacenter candidate sites near DEADEND167018 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of DEADEND167018. The highest-scoring is OZ Concordia at 58/100. Across Louisiana, the average DC Readiness score is 53.1.
More in Louisiana
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “DEADEND167018 substation, Louisiana”, https://gridcensus.com/substations/louisiana/deadend167018-12aaad84 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for DEADEND167018 substation, Louisiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.