TAP169211
SubstationKentucky
At a glance
TAP169211 is an electric transmission substation in Kentucky. It is classified as distribution (69–115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
No owner is recorded for the lines that connect here.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #170838 | 69 kV | — | IN SERVICE | 2.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP169211, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| BROWN (345 KV) | Substation-Adjacent | IN | Vanderburgh County | 345 kV | 600 MW | 3.0 yrs | 70.8 |
| EC Coal Vanderburgh County | Greenfield | IN | Vanderburgh County | — | — | 3.0 yrs | 62.8 |
| EC Near Broadway (IN) | Greenfield | IN | Vanderburgh | — | — | 3.0 yrs | 62.0 |
| EC Near A B Brown | Greenfield | IN | Posey | — | — | 3.0 yrs | 62.0 |
| UNKNOWN123353 | Substation-Adjacent | KY | Henderson County | 161 kV | 100 MW | 3.9 yrs | 61.7 |
| EC Coal Hopkins County | Greenfield | KY | Hopkins County | — | — | 3.9 yrs | 61.6 |
| PIGEON CREEK TRANS | Substation-Adjacent | IN | Vanderburgh County | 138 kV | 100 MW | 3.0 yrs | 61.6 |
| UNKNOWN127558 | Substation-Adjacent | IN | Vanderburgh County | 138 kV | 100 MW | 3.0 yrs | 61.3 |
How do candidate sites near TAP169211 score?
The 8 highest-scoring candidate sites within about 25 miles range from 61 to 71 on the 0–100 DC Readiness scale. They fall in Vanderburgh County, Vanderburgh, Posey, Henderson County. The Kentucky average across 7,741 scored sites is 52.8. 1,261 of those Kentucky sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP169211 substation?
TAP169211 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP169211 is below the national midpoint.
How many transmission lines connect to TAP169211 substation?
1 transmission line terminate at or pass through TAP169211 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 2 miles.
Where is TAP169211 substation located?
TAP169211 is in Kentucky at 37.6919, -87.9708. The datacenter candidate sites closest to it are in Vanderburgh County, Vanderburgh, Posey.
Are there datacenter candidate sites near TAP169211 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP169211. The highest-scoring is BROWN (345 KV) at 71/100. Across Kentucky, the average DC Readiness score is 52.8.
More in Kentucky
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP169211 substation, Kentucky”, https://gridcensus.com/substations/kentucky/tap169211-50757bf1 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP169211 substation, Kentucky is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.