RISER169313

Substation

Kentucky

Max voltage
—
kV

RISER169313 is an electric transmission substation in Kentucky. It is classified as unclassified and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

Coordinates38.1869, -84.8936

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RISER169313, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RISER169313 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP140103Substation-AdjacentKYWoodford County345 kV600 MW3.9 yrs69.2
BROWN PLANTSubstation-AdjacentKYMercer County345 kV600 MW3.9 yrs67.4
UNKNOWN130278Substation-AdjacentKYFayette County138 kV100 MW3.9 yrs65.5
UNKNOWN130239Substation-AdjacentKYFayette County138 kV100 MW3.9 yrs65.3
EC Coal Fayette CountyGreenfieldKYFayette County——3.9 yrs65.1
HAEFLINGSubstation-AdjacentKYFayette County138 kV100 MW3.9 yrs64.9
UNKNOWN129047Substation-AdjacentKYFranklin County345 kV600 MW4.7 yrs64.9
EC Near HaeflingGreenfieldKYFayette——3.9 yrs64.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for RISER169313 substation, Kentucky is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.