At a glance

TAP148752 is a 69 kV electric substation in Kansas on KANSAS GAS & ELECTRIC CO's transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is EC Coal Anderson County in Anderson County, with a DC Readiness score of 59/100.

TAP148752 is an electric transmission substation in Kansas, on KANSAS GAS & ELECTRIC CO's transmission network. It is classified as distribution (69–115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines2

Ownership

Line owner (most lines)KANSAS GAS & ELECTRIC CO
StateKansas
Coordinates37.8012, -95.4289

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#10827169 kVKANSAS GAS & ELECTRIC COIN SERVICE0.3 mi
#13385369 kVKANSAS GAS & ELECTRIC COIN SERVICE2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP148752, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP148752 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Coal Anderson CountyGreenfieldKSAnderson County——4.3 yrs59.1
EC Near IolaGreenfieldKSAllen——4.3 yrs58.4
EC Near Chanute 1GreenfieldKSNeosho——4.3 yrs57.9
EC Coal Neosho CountyGreenfieldKSNeosho County——4.3 yrs57.8
EC Near Chanute 1GreenfieldKSNeosho——4.3 yrs57.8
EC Near Chanute 1GreenfieldKSNeosho——4.3 yrs57.5
EC Near Archer Daniels Midland FredoniaGreenfieldKSWilson——4.3 yrs57.4
EC Near ErieGreenfieldKSNeosho——4.3 yrs57.4

Who owns the transmission lines at TAP148752?

The 2 connected lines listed above are owned by KANSAS GAS & ELECTRIC CO. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 2.7 miles.

How do candidate sites near TAP148752 score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 59 on the 0–100 DC Readiness scale. They fall in Anderson County, Allen, Neosho, Neosho County. The Kansas average across 2,352 scored sites is 53.2. 730 of those Kansas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP148752 substation?

TAP148752 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP148752 is below the national midpoint.

How many transmission lines connect to TAP148752 substation?

2 transmission lines terminate at or pass through TAP148752 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 2.7 miles.

Who owns TAP148752 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP148752 belong to KANSAS GAS & ELECTRIC CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP148752 substation located?

TAP148752 is in Kansas at 37.8012, -95.4289. The datacenter candidate sites closest to it are in Anderson County, Allen, Neosho.

Are there datacenter candidate sites near TAP148752 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP148752. The highest-scoring is EC Coal Anderson County at 59/100. Across Kansas, the average DC Readiness score is 53.2.

More in Kansas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP148752 substation, Kansas”, https://gridcensus.com/substations/kansas/tap148752-e5eeca93 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP148752 substation, Kansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.