Skip to content
Gridcensus

TAP138835

Substation

Kansas · WESTAR ENERGY INC

Max voltage
115
kV

At a glance

TAP138835 is a 115 kV electric substation in Kansas on WESTAR ENERGY INC's transmission network, recorded in the HIFLD transmission dataset. 5 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is SUMMIT in Saline County, with a DC Readiness score of 62/100.

TAP138835 is an electric transmission substation in Kansas, on WESTAR ENERGY INC's transmission network. It is classified as sub-transmission (115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines5

Ownership

Line owner (most lines)WESTAR ENERGY INC
StateKansas
Coordinates38.8483, -97.5753

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#134851115 kVWESTAR ENERGY INCIN SERVICE0.0 mi
#139732115 kVWESTAR ENERGY INCIN SERVICE1.6 mi
#144607115 kVWESTAR ENERGY INCIN SERVICE3.2 mi
#147701115 kVWESTAR ENERGY INCIN SERVICE24.8 mi
#151131115 kVWESTAR ENERGY INCIN SERVICE1.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138835, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138835 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SUMMITSubstation-AdjacentKSSaline County345 kV600 MW4.3 yrs62.2
EC Dickinson Coal AreaGreenfieldKSDickinson——4.3 yrs59.0
EC Dickinson Coal AreaGreenfieldKSDickinson——4.3 yrs57.9
OZ SalineGreenfieldKSSaline——4.3 yrs57.9
EC Dickinson Coal AreaGreenfieldKSDickinson——4.3 yrs57.8
EC Dickinson Coal AreaGreenfieldKSDickinson——4.3 yrs57.4
EC Dickinson Coal AreaGreenfieldKSDickinson——4.3 yrs56.4
UNKNOWN118150Substation-AdjacentKSSaline County115 kV100 MW4.3 yrs56.3

Who owns the transmission lines at TAP138835?

The 5 connected lines listed above are owned by WESTAR ENERGY INC. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 31.3 miles.

How do candidate sites near TAP138835 score?

The 8 highest-scoring candidate sites within about 25 miles range from 56 to 62 on the 0–100 DC Readiness scale. They fall in Saline County, Dickinson, Saline. The Kansas average across 2,352 scored sites is 53.2. 730 of those Kansas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP138835 substation?

TAP138835 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP138835 is at the national midpoint.

How many transmission lines connect to TAP138835 substation?

5 transmission lines terminate at or pass through TAP138835 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 31.3 miles.

Who owns TAP138835 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP138835 belong to WESTAR ENERGY INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP138835 substation located?

TAP138835 is in Kansas at 38.8483, -97.5753. The datacenter candidate sites closest to it are in Saline County, Dickinson, Saline.

Are there datacenter candidate sites near TAP138835 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP138835. The highest-scoring is SUMMIT at 62/100. Across Kansas, the average DC Readiness score is 53.2.

More in Kansas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP138835 substation, Kansas”, https://gridcensus.com/substations/kansas/tap138835-03801321 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP138835 substation, Kansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.