Skip to content
Gridcensus

TAP167865

Substation

Iowa

Max voltage
69
kV

At a glance

TAP167865 is a 69 kV electric substation in Iowa, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is O'BRIEN in O'Brien County, with a DC Readiness score of 66/100.

TAP167865 is an electric transmission substation in Iowa. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

No owner is recorded for the lines that connect here.

StateIowa
Coordinates43.1714, -95.8539

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16894569 kV—IN SERVICE0.4 mi
#16894669 kV—IN SERVICE6.4 mi
#17592369 kV—IN SERVICE7.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP167865, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP167865 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
O'BRIENSubstation-AdjacentIAO'Brien County345 kV600 MW4.3 yrs65.7
UNKNOWN138106Substation-AdjacentIAO'Brien County345 kV600 MW4.3 yrs63.7
UNKNOWN130479Substation-AdjacentIALyon County230 kV300 MW4.3 yrs63.2
EC Near LuverneGreenfieldMNRock——4.3 yrs61.0
EC Near PrimgharGreenfieldIAO'Brien——4.3 yrs60.7
EC Near PrimgharGreenfieldIAO'Brien——4.3 yrs60.6
EC Near PrimgharGreenfieldIAO'Brien——4.3 yrs60.5
UNKNOWN137000Substation-AdjacentIAPlymouth County161 kV100 MW4.3 yrs60.4

How do candidate sites near TAP167865 score?

The 8 highest-scoring candidate sites within about 25 miles range from 60 to 66 on the 0–100 DC Readiness scale. They fall in O'Brien County, Lyon County, Rock, O'Brien. The Iowa average across 2,572 scored sites is 56.4. 761 of those Iowa sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP167865 substation?

TAP167865 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP167865 is below the national midpoint.

How many transmission lines connect to TAP167865 substation?

3 transmission lines terminate at or pass through TAP167865 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 14.7 miles.

Where is TAP167865 substation located?

TAP167865 is in Iowa at 43.1714, -95.8539. The datacenter candidate sites closest to it are in O'Brien County, Lyon County, Rock.

Are there datacenter candidate sites near TAP167865 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP167865. The highest-scoring is O'BRIEN at 66/100. Across Iowa, the average DC Readiness score is 56.4.

More in Iowa

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP167865 substation, Iowa”, https://gridcensus.com/substations/iowa/tap167865-c9462ebb (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP167865 substation, Iowa is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.