Gridcensus

TAP159237

Substation

Iowa

Max voltage
69
kV

At a glance

TAP159237 is a 69 kV electric substation in Iowa, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is EC Near Walter Scott Jr Energy Center in Pottawattamie, with a DC Readiness score of 62/100.

TAP159237 is an electric transmission substation in Iowa. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

No owner is recorded for the lines that connect here.

StateIowa
Coordinates41.6386, -95.4513

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16267069 kV—IN SERVICE3.7 mi
#16267169 kV—IN SERVICE0.5 mi
#16267369 kV—IN SERVICE7.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP159237, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP159237 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near Walter Scott Jr Energy CenterGreenfieldIAPottawattamie——4.3 yrs61.6
EC Coal Pottawattamie CountyGreenfieldIAPottawattamie County——4.3 yrs61.5
EC Coal Pottawattamie CountyGreenfieldIAPottawattamie County——4.3 yrs61.5
UNKNOWN130804Substation-AdjacentIAPottawattamie County161 kV100 MW4.3 yrs61.0
OZ ShelbyGreenfieldIAShelby——4.3 yrs59.2
EC Near AtlanticGreenfieldIACass——4.3 yrs58.7
UNKNOWN130802Substation-AdjacentIAShelby County161 kV100 MW4.3 yrs58.4
EC Near AtlanticGreenfieldIACass——4.3 yrs58.2

How do candidate sites near TAP159237 score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 62 on the 0–100 DC Readiness scale. They fall in Pottawattamie, Pottawattamie County, Shelby, Cass. The Iowa average across 2,572 scored sites is 56.4. 761 of those Iowa sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP159237 substation?

TAP159237 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP159237 is below the national midpoint.

How many transmission lines connect to TAP159237 substation?

3 transmission lines terminate at or pass through TAP159237 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 11.4 miles.

Where is TAP159237 substation located?

TAP159237 is in Iowa at 41.6386, -95.4513. The datacenter candidate sites closest to it are in Pottawattamie, Pottawattamie County, Shelby.

Are there datacenter candidate sites near TAP159237 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP159237. The highest-scoring is EC Near Walter Scott Jr Energy Center at 62/100. Across Iowa, the average DC Readiness score is 56.4.

More in Iowa

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP159237 substation, Iowa”, https://gridcensus.com/substations/iowa/tap159237-20439717 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP159237 substation, Iowa is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.