PADDYS WEST
SubstationIndiana
PADDYS WEST is an electric transmission substation in Indiana. It is classified as high-voltage (345 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of PADDYS WEST, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CANE RUN | Substation-Adjacent | KY | Floyd County | 345 kV | 600 MW | 3.8 yrs | 69.0 |
| UNKNOWN124909 | Substation-Adjacent | IN | Floyd County | 230 kV | 300 MW | 3.8 yrs | 67.9 |
| MIDDLETOWN 345 KV | Substation-Adjacent | KY | Jefferson County | 345 kV | 600 MW | 3.8 yrs | 67.0 |
| MILL CREEK STATION | Substation-Adjacent | KY | Bullitt County | 345 kV | 600 MW | 3.8 yrs | 65.9 |
| PADDYS WEST | Substation-Adjacent | IN | Floyd County | 345 kV | 600 MW | 3.8 yrs | 65.5 |
| KENZIG | Substation-Adjacent | IN | Floyd County | 345 kV | 600 MW | 3.8 yrs | 65.3 |
| CANE RUN SWITCHING | Substation-Adjacent | KY | Floyd County | 345 kV | 600 MW | 3.8 yrs | 65.2 |
| NORTHSIDE | Substation-Adjacent | IN | Clark County | 345 kV | 600 MW | 3.8 yrs | 64.8 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for PADDYS WEST substation, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.