TAP138537

Substation

Illinois · AMEREN ILLINOIS COMPANY

Max voltage
—
kV

At a glance

TAP138537 is an electric substation in Illinois on AMEREN ILLINOIS COMPANY's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is OZ Des Moines in Des Moines, with a DC Readiness score of 61/100.

TAP138537 is an electric transmission substation in Illinois, on AMEREN ILLINOIS COMPANY's transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

Line owner (most lines)AMEREN ILLINOIS COMPANY
Coordinates40.7169, -91.0090

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13028269 kVAMEREN ILLINOIS COMPANYIN SERVICE6.4 mi
#14151969 kVAMEREN ILLINOIS COMPANYIN SERVICE0.0 mi
#16601469 kVAMEREN ILLINOIS COMPANYIN SERVICE5.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138537, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138537 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ Des MoinesGreenfieldIADes Moines——4.3 yrs60.9
EC Near Alliant SBD 9402 ClimaxGreenfieldIALee——4.3 yrs58.4
OZ LeeGreenfieldIALee——4.3 yrs58.4
EC Near Agency GTGreenfieldIADes Moines——4.3 yrs58.2
EC Near Agency GTGreenfieldIADes Moines——4.3 yrs58.2
OZ WarrenGreenfieldILWarren——4.8 yrs58.0
EC Near Agency GTGreenfieldIADes Moines——4.3 yrs57.8
EC Near Agency GTGreenfieldIADes Moines——4.3 yrs57.7

Who owns the transmission lines at TAP138537?

The 3 connected lines listed above are owned by AMEREN ILLINOIS COMPANY. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 11.5 miles.

How do candidate sites near TAP138537 score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 61 on the 0–100 DC Readiness scale. They fall in Des Moines, Lee, Warren. The Illinois average across 3,641 scored sites is 54.3. 795 of those Illinois sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP138537 substation?

3 transmission lines terminate at or pass through TAP138537 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 11.5 miles.

Who owns TAP138537 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP138537 belong to AMEREN ILLINOIS COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP138537 substation located?

TAP138537 is in Illinois at 40.7169, -91.0090. The datacenter candidate sites closest to it are in Des Moines, Lee, Warren.

Are there datacenter candidate sites near TAP138537 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP138537. The highest-scoring is OZ Des Moines at 61/100. Across Illinois, the average DC Readiness score is 54.3.

More in Illinois

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP138537 substation, Illinois”, https://gridcensus.com/substations/illinois/tap138537-f4ac4eb4 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP138537 substation, Illinois is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.