OSWEGO
SubstationIllinois · COMMONWEALTH EDISON CO
At a glance
OSWEGO is an electric transmission substation in Illinois, on COMMONWEALTH EDISON CO's transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #113350 | 138 kV | COMMONWEALTH EDISON CO | IN SERVICE | 3.5 mi |
| #128416 | 138 kV | COMMONWEALTH EDISON CO | IN SERVICE | 3.5 mi |
| #150393 | 138 kV | COMMONWEALTH EDISON CO | IN SERVICE | 6.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of OSWEGO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| PLANO (765 KV) | Substation-Adjacent | IL | Kendall County | 765 kV | 1,000 MW | 4.8 yrs | 68.5 |
| JOLIET | Substation-Adjacent | IL | Will County | 345 kV | 600 MW | 4.8 yrs | 67.4 |
| ELECTRIC LIGHT 345 KV | Substation-Adjacent | IL | DuPage County | 345 kV | 600 MW | 4.8 yrs | 66.7 |
| Electric Junction | Brownfield | IL | DuPage County | — | 304 MW | 4.8 yrs | 66.7 |
| ELMHURST | Substation-Adjacent | IL | DuPage County | 345 kV | 600 MW | 4.8 yrs | 66.7 |
| UNKNOWN122226 | Substation-Adjacent | IL | DuPage County | 345 kV | 600 MW | 4.8 yrs | 66.6 |
| LISLE | Substation-Adjacent | IL | DuPage County | 345 kV | 600 MW | 4.8 yrs | 66.6 |
| TAP138235 | Substation-Adjacent | IL | DuPage County | 345 kV | 600 MW | 4.8 yrs | 66.6 |
How does OSWEGO compare with other substations in Illinois?
Illinois has 1,986 substation records in HIFLD, of which 209 carry a station name; the rest are unnamed tap points, risers and line ends. 90 named substations in the state are in OSWEGO's 115–229 kV band (43% of named stations). 95 sit in a higher band. 92 named substations in Illinois operate at 345 kV or above. The highest voltage recorded in the state is 765 kV, and the state median is 161 kV.
Who owns the transmission lines at OSWEGO?
The 3 connected lines listed above are owned by COMMONWEALTH EDISON CO. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 13.9 miles.
How do candidate sites near OSWEGO score?
The 8 highest-scoring candidate sites within about 25 miles range from 67 to 69 on the 0–100 DC Readiness scale. They fall in Kendall County, Will County, DuPage County. The Illinois average across 3,641 scored sites is 54.3. 795 of those Illinois sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is OSWEGO substation?
OSWEGO has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so OSWEGO is above the national midpoint.
How many transmission lines connect to OSWEGO substation?
3 transmission lines terminate at or pass through OSWEGO in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 13.9 miles.
Who owns OSWEGO substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at OSWEGO belong to COMMONWEALTH EDISON CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is OSWEGO substation located?
OSWEGO is in Illinois at 41.7077, -88.2984. The datacenter candidate sites closest to it are in Kendall County, Will County, DuPage County.
Are there datacenter candidate sites near OSWEGO substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of OSWEGO. The highest-scoring is PLANO (765 KV) at 69/100. Across Illinois, the average DC Readiness score is 54.3.
Other 138 kV substations in Illinois
- EDWARDS· 15 lines
- EAST KEWANEE· 14 lines
- SKOKIE (138 KV)· 12 lines
- FARGO· 9 lines
- HAYFORD· 8 lines
- MUDDY· 8 lines
- NORTH DECATUR· 8 lines
- GRAND TOWER· 7 lines
- All named substations in Illinois· 209 stations
- Datacenter candidate sites in Illinois· 3,641 sites
- Brownfield and retired plant sites in Illinois
- Substations by state
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “OSWEGO substation, Illinois”, https://gridcensus.com/substations/illinois/oswego-4cf1cfa0 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for OSWEGO substation, Illinois is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.