YOUNGCANE is an electric transmission substation in Georgia. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

StateGeorgia
Coordinates34.8588, -84.1000

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of YOUNGCANE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near YOUNGCANE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN110439Substation-AdjacentGAGilmer County230 kV300 MW5.8 yrs60.2
APALACHIASubstation-AdjacentTNPolk County161 kV100 MW3.9 yrs58.2
OCOEE #3Substation-AdjacentTNPolk County161 kV100 MW3.9 yrs57.7
BASINSubstation-AdjacentTNFannin County161 kV100 MW3.9 yrs57.2
OZ PolkGreenfieldTNPolk——3.9 yrs57.0
MURPHYSubstation-AdjacentNCCherokee County161 kV100 MW5.3 yrs57.0
UNKNOWN109616Substation-AdjacentNCCherokee County161 kV100 MW5.3 yrs56.9
UNKNOWN110337Substation-AdjacentGADawson County115 kV100 MW5.8 yrs56.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for YOUNGCANE substation, Georgia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.