Skip to content
Gridcensus

TAP143061

Substation

Georgia · GEORGIA POWER CO

Max voltage
115
kV

At a glance

TAP143061 is a 115 kV electric substation in Georgia on GEORGIA POWER CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN115708 in Heard County, with a DC Readiness score of 70/100.

TAP143061 is an electric transmission substation in Georgia, on GEORGIA POWER CO's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)GEORGIA POWER CO
StateGeorgia
Coordinates33.0116, -85.0250

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#120313115 kVGEORGIA POWER COIN SERVICE1.9 mi
#138510115 kVGEORGIA POWER COIN SERVICE1.4 mi
#141870115 kVGEORGIA POWER COIN SERVICE1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP143061, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP143061 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN115708Substation-AdjacentGAHeard County500 kV1,000 MW5.8 yrs69.9
UNKNOWN115703Substation-AdjacentGAHeard County500 kV1,000 MW5.8 yrs66.1
UNKNOWN109349Substation-AdjacentALLee County230 kV300 MW3.9 yrs65.3
UNKNOWN113548Substation-AdjacentGAMuscogee County230 kV300 MW5.8 yrs64.3
UNKNOWN113545Substation-AdjacentGAHarris County230 kV300 MW5.8 yrs63.7
UNKNOWN109348Substation-AdjacentALChambers County230 kV300 MW3.9 yrs63.5
UNKNOWN113546Substation-AdjacentGAHarris County230 kV300 MW5.8 yrs63.2
UNKNOWN115706Substation-AdjacentGAHeard County230 kV300 MW5.8 yrs61.9

Who owns the transmission lines at TAP143061?

The 3 connected lines listed above are owned by GEORGIA POWER CO. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 4.4 miles.

How do candidate sites near TAP143061 score?

The 8 highest-scoring candidate sites within about 25 miles range from 62 to 70 on the 0–100 DC Readiness scale. They fall in Heard County, Lee County, Muscogee County, Harris County. The Georgia average across 2,478 scored sites is 57.1. 1,530 of those Georgia sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP143061 substation?

TAP143061 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP143061 is at the national midpoint.

How many transmission lines connect to TAP143061 substation?

3 transmission lines terminate at or pass through TAP143061 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 4.4 miles.

Who owns TAP143061 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP143061 belong to GEORGIA POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP143061 substation located?

TAP143061 is in Georgia at 33.0116, -85.0250. The datacenter candidate sites closest to it are in Heard County, Lee County, Muscogee County.

Are there datacenter candidate sites near TAP143061 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP143061. The highest-scoring is UNKNOWN115708 at 70/100. Across Georgia, the average DC Readiness score is 57.1.

More in Georgia

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP143061 substation, Georgia”, https://gridcensus.com/substations/georgia/tap143061-9f6dc9cf (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP143061 substation, Georgia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.