RISER169137
SubstationGeorgia · GEORGIA POWER CO
At a glance
RISER169137 is an electric transmission substation in Georgia, on GEORGIA POWER CO's transmission network. It is classified as unclassified and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #170765 | — | GEORGIA POWER CO | IN SERVICE | 3.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of RISER169137, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN115783 | Substation-Adjacent | GA | Monroe County | 500 kV | 1,000 MW | 5.8 yrs | 69.8 |
| BONAIRE | Substation-Adjacent | GA | Houston County | 500 kV | 1,000 MW | 5.8 yrs | 64.7 |
| UNKNOWN113537 | Substation-Adjacent | GA | Twiggs County | 230 kV | 300 MW | 5.8 yrs | 61.9 |
| UNKNOWN113560 | Substation-Adjacent | GA | Crawford County | 230 kV | 300 MW | 5.8 yrs | 61.9 |
| UNKNOWN115232 | Substation-Adjacent | GA | Monroe County | 115 kV | 100 MW | 5.8 yrs | 61.0 |
| UNKNOWN112280 | Substation-Adjacent | GA | Wilkinson County | 230 kV | 300 MW | 5.8 yrs | 60.9 |
| EC Near Rumble Road Energy Center | Greenfield | GA | Monroe | — | — | 5.8 yrs | 60.9 |
| UNKNOWN114837 | Substation-Adjacent | GA | Bibb County | 230 kV | 300 MW | 5.8 yrs | 60.5 |
Who owns the transmission lines at RISER169137?
The 1 connected line listed above is owned by GEORGIA POWER CO. Their combined recorded length is about 3.2 miles.
How do candidate sites near RISER169137 score?
The 8 highest-scoring candidate sites within about 25 miles range from 61 to 70 on the 0–100 DC Readiness scale. They fall in Monroe County, Houston County, Twiggs County, Crawford County. The Georgia average across 2,478 scored sites is 57.1. 1,530 of those Georgia sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
How many transmission lines connect to RISER169137 substation?
1 transmission line terminate at or pass through RISER169137 in the HIFLD line data. Together the listed lines cover about 3.2 miles.
Who owns RISER169137 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at RISER169137 belong to GEORGIA POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is RISER169137 substation located?
RISER169137 is in Georgia at 32.7164, -83.6226. The datacenter candidate sites closest to it are in Monroe County, Houston County, Twiggs County.
Are there datacenter candidate sites near RISER169137 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of RISER169137. The highest-scoring is UNKNOWN115783 at 70/100. Across Georgia, the average DC Readiness score is 57.1.
More in Georgia
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “RISER169137 substation, Georgia”, https://gridcensus.com/substations/georgia/riser169137-d3bf88d8 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for RISER169137 substation, Georgia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.