Max voltage
230
kV

EAST SOCIAL CIRCLE is an electric transmission substation in Georgia. It is classified as high-voltage (230 kv) and connects 10 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines10

Ownership & operation

Operator not catalogued for this substation.

StateGeorgia
Coordinates33.6739, -83.6793

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EAST SOCIAL CIRCLE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EAST SOCIAL CIRCLE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN116231Substation-AdjacentGAGwinnett County230 kV300 MW1.0 yrs70.3
UNKNOWN116232Substation-AdjacentGAGwinnett County230 kV300 MW1.0 yrs70.0
UNKNOWN116108Substation-AdjacentGAGwinnett County230 kV300 MW1.0 yrs68.9
UNKNOWN116086Substation-AdjacentGAGwinnett County230 kV300 MW1.0 yrs68.7
UNKNOWN116106Substation-AdjacentGAGwinnett County230 kV300 MW1.0 yrs68.6
UNKNOWN116105Substation-AdjacentGAGwinnett County230 kV300 MW1.0 yrs68.0
UNKNOWN116100Substation-AdjacentGAGwinnett County230 kV300 MW1.0 yrs67.8
UNKNOWN116163Substation-AdjacentGAGwinnett County230 kV300 MW1.0 yrs67.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EAST SOCIAL CIRCLE substation, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.