TAP153465 is an electric transmission substation in Florida. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateFlorida
Coordinates30.7420, -86.6391

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP153465, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP153465 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WRIGHTSubstation-AdjacentFLOkaloosa County230 kV300 MW3.7 yrs64.7
SHOAL RIVERSubstation-AdjacentFLOkaloosa County230 kV300 MW3.7 yrs63.6
UNKNOWN120703Substation-AdjacentFLSanta Rosa County230 kV300 MW3.7 yrs62.8
OCEAN CITYSubstation-AdjacentFLOkaloosa County115 kV100 MW3.7 yrs61.2
FORT WALTONSubstation-AdjacentFLOkaloosa County115 kV100 MW3.7 yrs61.2
SULLIVAN STREETSubstation-AdjacentFLOkaloosa County115 kV100 MW3.7 yrs61.1
DESTINSubstation-AdjacentFLOkaloosa County115 kV100 MW3.7 yrs60.6
TAP153469Substation-AdjacentFLOkaloosa County115 kV100 MW3.7 yrs60.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP153465 substation, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.