Skip to content
Gridcensus

NEWBERRY

Substation

Florida

Max voltage
230
kV

NEWBERRY is an electric transmission substation in Florida. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage69 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

Operator not catalogued for this substation.

StateFlorida
Coordinates29.6369, -82.6786

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NEWBERRY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NEWBERRY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ AlachuaGreenfieldFLAlachua3.6 yrs63.9
EC Near John R KellyGreenfieldFLAlachua3.6 yrs62.9
OZ AlachuaGreenfieldFLAlachua3.6 yrs62.8
OZ GilchristGreenfieldFLGilchrist3.6 yrs62.1
NEWBERRYSubstation-AdjacentFLGilchrist County230 kV300 MW1.0 yrs60.4
UNKNOWN120457Substation-AdjacentFLGilchrist County230 kV300 MW1.0 yrs60.4
NEWBERRYSubstation-AdjacentFLGilchrist County230 kV300 MW1.0 yrs60.4
EC Near John R KellyGreenfieldFLAlachua3.6 yrs59.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NEWBERRY substation, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.