Skip to content
Gridcensus

TAP209522

Substation

Colorado · YAMPA VALLEY ELECTRIC ASSN INC

Max voltage
115
kV

At a glance

TAP209522 is a 115 kV electric substation in Colorado on YAMPA VALLEY ELECTRIC ASSN INC's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is HAYDEN in Routt County, with a DC Readiness score of 57/100.

TAP209522 is an electric transmission substation in Colorado, on YAMPA VALLEY ELECTRIC ASSN INC's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)YAMPA VALLEY ELECTRIC ASSN INC
Coordinates40.5209, -106.8544

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#211757115 kVYAMPA VALLEY ELECTRIC ASSN INC—15.1 mi
#211758115 kVYAMPA VALLEY ELECTRIC ASSN INC—0.4 mi
#211759115 kVYAMPA VALLEY ELECTRIC ASSN INC—2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209522, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209522 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HAYDENSubstation-AdjacentCORoutt County230 kV300 MW3.5 yrs57.4
UNKNOWN202355Substation-AdjacentCORoutt County230 kV300 MW3.5 yrs57.4
STEAMBOATSubstation-AdjacentCORoutt County230 kV300 MW3.5 yrs57.4
EC Coal Routt CountyGreenfieldCORoutt County——3.5 yrs56.0
UNKNOWN202356Substation-AdjacentCORoutt County138 kV100 MW3.5 yrs53.4
UNKNOWN205173Substation-AdjacentCORoutt County115 kV100 MW3.5 yrs53.0
UNKNOWN205174Substation-AdjacentCORoutt County115 kV100 MW3.5 yrs53.0
UNKNOWN202246Substation-AdjacentCORoutt County115 kV100 MW3.5 yrs53.0

Who owns the transmission lines at TAP209522?

The 3 connected lines listed above are owned by YAMPA VALLEY ELECTRIC ASSN INC. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 17.9 miles.

How do candidate sites near TAP209522 score?

The 8 highest-scoring candidate sites within about 25 miles range from 53 to 57 on the 0–100 DC Readiness scale. They fall in Routt County. The Colorado average across 3,428 scored sites is 50.6. 899 of those Colorado sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP209522 substation?

TAP209522 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP209522 is at the national midpoint.

How many transmission lines connect to TAP209522 substation?

3 transmission lines terminate at or pass through TAP209522 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 17.9 miles.

Who owns TAP209522 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP209522 belong to YAMPA VALLEY ELECTRIC ASSN INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP209522 substation located?

TAP209522 is in Colorado at 40.5209, -106.8544. The datacenter candidate sites closest to it are in Routt County.

Are there datacenter candidate sites near TAP209522 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP209522. The highest-scoring is HAYDEN at 57/100. Across Colorado, the average DC Readiness score is 50.6.

More in Colorado

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP209522 substation, Colorado”, https://gridcensus.com/substations/colorado/tap209522-c478a054 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP209522 substation, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.