TAP208150

Substation

Colorado

Max voltage
69
kV

TAP208150 is an electric transmission substation in Colorado. It is classified as distribution (69–115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

Coordinates40.1755, -104.9421

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208150, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208150 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CHEROKEESubstation-AdjacentCODenver County230 kV300 MW3.5 yrs67.9
SILVER SADDLESubstation-AdjacentCODenver County230 kV300 MW4.3 yrs64.3
REUNIONSubstation-AdjacentCODenver County230 kV300 MW4.3 yrs63.9
EC Near Front Range ProjectGreenfieldCOWeld——4.3 yrs63.8
VALMONTSubstation-AdjacentCOBroomfield County230 kV300 MW3.5 yrs63.6
EC Near ZuniGreenfieldCODenver——3.5 yrs63.5
RIVERDALESubstation-AdjacentCODenver County230 kV300 MW3.5 yrs63.4
EC Coal Adams CountyGreenfieldCOAdams County——3.5 yrs63.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP208150 substation, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.