Skip to content
Gridcensus

TAP208122

Substation

Colorado

Max voltage
69
kV

TAP208122 is an electric transmission substation in Colorado. It is classified as distribution (69–115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

Coordinates38.7022, -105.1366

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208122, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208122 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN202739Substation-AdjacentCOEl Paso County230 kV300 MW4.3 yrs65.1
COTTONWOODSubstation-AdjacentCOEl Paso County230 kV300 MW4.3 yrs64.3
EC Near South Plant (CO)GreenfieldCOEl Paso——4.3 yrs63.1
MARTIN DRAKESubstation-AdjacentCOEl Paso County115 kV100 MW4.3 yrs62.4
EC Coal El Paso CountyGreenfieldCOEl Paso County——4.3 yrs62.4
EC Coal El Paso CountyGreenfieldCOEl Paso County——4.3 yrs62.2
OZ El PasoGreenfieldCOEl Paso——4.3 yrs60.9
SANTA FESubstation-AdjacentCOEl Paso County115 kV100 MW4.3 yrs60.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP208122 substation, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.