TAP206911

Substation

Colorado · DELTA MONTROSE ELECTRIC ASSN

Max voltage
69
kV

At a glance

TAP206911 is a 69 kV electric substation in Colorado on DELTA MONTROSE ELECTRIC ASSN's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is 3 MW LLC in Delta County, with a DC Readiness score of 59/100.

TAP206911 is an electric transmission substation in Colorado, on DELTA MONTROSE ELECTRIC ASSN's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage46 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)DELTA MONTROSE ELECTRIC ASSN
Coordinates38.9133, -107.5323

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20778469 kVDELTA MONTROSE ELECTRIC ASSN—1.0 mi
#20778046 kVDELTA MONTROSE ELECTRIC ASSN—1.4 mi
#20778146 kVDELTA MONTROSE ELECTRIC ASSN—4.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206911, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206911 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
3 MW LLCBrownfieldCODelta County115 kV3 MW4.3 yrs58.8
OZ MontroseGreenfieldCOMontrose——4.3 yrs58.3
EC Coal Delta CountyGreenfieldCODelta County——4.3 yrs58.2
EC Coal Delta CountyGreenfieldCODelta County——4.3 yrs58.1
EC Coal Delta CountyGreenfieldCODelta County——4.3 yrs56.6
UNKNOWN206914Substation-AdjacentCODelta County138 kV100 MW4.3 yrs55.9
HOTCHKISSSubstation-AdjacentCODelta County138 kV100 MW4.3 yrs55.8
EC Near 3 MW LLCGreenfieldCOGunnison——4.3 yrs55.6

Who owns the transmission lines at TAP206911?

The 3 connected lines listed above are owned by DELTA MONTROSE ELECTRIC ASSN. Line voltages range from 46 kV to 69 kV. Their combined recorded length is about 6.5 miles.

How do candidate sites near TAP206911 score?

The 8 highest-scoring candidate sites within about 25 miles range from 56 to 59 on the 0–100 DC Readiness scale. They fall in Delta County, Montrose, Gunnison. The Colorado average across 3,428 scored sites is 50.6. 899 of those Colorado sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP206911 substation?

TAP206911 has a maximum voltage of 69 kV and a minimum of 46 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP206911 is below the national midpoint.

How many transmission lines connect to TAP206911 substation?

3 transmission lines terminate at or pass through TAP206911 in the HIFLD line data. The connected lines listed here run at 69 kV, 46 kV. Together the listed lines cover about 6.5 miles.

Who owns TAP206911 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP206911 belong to DELTA MONTROSE ELECTRIC ASSN. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP206911 substation located?

TAP206911 is in Colorado at 38.9133, -107.5323. The datacenter candidate sites closest to it are in Delta County, Montrose, Gunnison.

Are there datacenter candidate sites near TAP206911 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP206911. The highest-scoring is 3 MW LLC at 59/100. Across Colorado, the average DC Readiness score is 50.6.

More in Colorado

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP206911 substation, Colorado”, https://gridcensus.com/substations/colorado/tap206911-14f3cbec (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP206911 substation, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.