TAP205876

Substation

Colorado · HIGHLINE ELECTRIC ASSN

Max voltage
115
kV

At a glance

TAP205876 is a 115 kV electric substation in Colorado on HIGHLINE ELECTRIC ASSN's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is EC Near Sidney (NE) in Cheyenne, with a DC Readiness score of 59/100.

TAP205876 is an electric transmission substation in Colorado, on HIGHLINE ELECTRIC ASSN's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)HIGHLINE ELECTRIC ASSN
Coordinates40.7110, -103.0549

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#205143115 kVHIGHLINE ELECTRIC ASSN—15.8 mi
#205144115 kVHIGHLINE ELECTRIC ASSN—5.2 mi
#205145115 kVHIGHLINE ELECTRIC ASSN—4.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205876, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205876 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near Sidney (NE)GreenfieldNECheyenne——4.3 yrs58.9
RIDGECREST WINDFARMSubstation-AdjacentCOLogan County230 kV300 MW4.3 yrs58.8
EC Near Sidney (NE)GreenfieldNECheyenne——4.3 yrs58.7
UNKNOWN201533Substation-AdjacentCOLogan County230 kV300 MW4.3 yrs58.7
UNKNOWN201538Substation-AdjacentCOKimball County230 kV300 MW4.3 yrs58.7
EC Near Sidney (NE)GreenfieldNECheyenne——4.3 yrs58.2
OZ LoganGreenfieldCOLogan——4.3 yrs57.9
OZ LoganGreenfieldCOLogan——4.3 yrs57.7

Who owns the transmission lines at TAP205876?

The 3 connected lines listed above are owned by HIGHLINE ELECTRIC ASSN. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 25.5 miles.

How do candidate sites near TAP205876 score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 59 on the 0–100 DC Readiness scale. They fall in Cheyenne, Logan County, Kimball County, Logan. The Colorado average across 3,428 scored sites is 50.6. 899 of those Colorado sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP205876 substation?

TAP205876 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP205876 is at the national midpoint.

How many transmission lines connect to TAP205876 substation?

3 transmission lines terminate at or pass through TAP205876 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 25.5 miles.

Who owns TAP205876 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP205876 belong to HIGHLINE ELECTRIC ASSN. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP205876 substation located?

TAP205876 is in Colorado at 40.7110, -103.0549. The datacenter candidate sites closest to it are in Cheyenne, Logan County, Kimball County.

Are there datacenter candidate sites near TAP205876 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP205876. The highest-scoring is EC Near Sidney (NE) at 59/100. Across Colorado, the average DC Readiness score is 50.6.

More in Colorado

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP205876 substation, Colorado”, https://gridcensus.com/substations/colorado/tap205876-31d3d9ff (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP205876 substation, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.