At a glance

TAP205179 is a 115 kV electric substation in Colorado on DELTA MONTROSE ELECTRIC ASSN's transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is 3 MW LLC in Delta County, with a DC Readiness score of 59/100.

TAP205179 is an electric transmission substation in Colorado, on DELTA MONTROSE ELECTRIC ASSN's transmission network. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership

Line owner (most lines)DELTA MONTROSE ELECTRIC ASSN
Coordinates38.9215, -107.4443

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#205312115 kVDELTA MONTROSE ELECTRIC ASSN—0.8 mi
#205313115 kVDELTA MONTROSE ELECTRIC ASSN—3.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205179, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205179 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
3 MW LLCBrownfieldCODelta County115 kV3 MW4.3 yrs58.8
EC Coal Delta CountyGreenfieldCODelta County——4.3 yrs58.2
EC Coal Delta CountyGreenfieldCODelta County——4.3 yrs58.1
UNKNOWN206914Substation-AdjacentCODelta County138 kV100 MW4.3 yrs55.9
HOTCHKISSSubstation-AdjacentCODelta County138 kV100 MW4.3 yrs55.8
EC Near 3 MW LLCGreenfieldCOGunnison——4.3 yrs55.6
JUANITASubstation-AdjacentCODelta County115 kV100 MW4.3 yrs55.5
TAP205179Substation-AdjacentCODelta County115 kV100 MW4.3 yrs55.5

Who owns the transmission lines at TAP205179?

The 2 connected lines listed above are owned by DELTA MONTROSE ELECTRIC ASSN. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 4.5 miles.

How do candidate sites near TAP205179 score?

The 8 highest-scoring candidate sites within about 25 miles range from 56 to 59 on the 0–100 DC Readiness scale. They fall in Delta County, Gunnison. The Colorado average across 3,428 scored sites is 50.6. 899 of those Colorado sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP205179 substation?

TAP205179 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP205179 is at the national midpoint.

How many transmission lines connect to TAP205179 substation?

2 transmission lines terminate at or pass through TAP205179 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 4.5 miles.

Who owns TAP205179 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP205179 belong to DELTA MONTROSE ELECTRIC ASSN. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP205179 substation located?

TAP205179 is in Colorado at 38.9215, -107.4443. The datacenter candidate sites closest to it are in Delta County, Gunnison.

Are there datacenter candidate sites near TAP205179 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP205179. The highest-scoring is 3 MW LLC at 59/100. Across Colorado, the average DC Readiness score is 50.6.

More in Colorado

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP205179 substation, Colorado”, https://gridcensus.com/substations/colorado/tap205179-ae003e60 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP205179 substation, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.