MISSLE SITE

Substation

Colorado

Max voltage
345
kV

MISSLE SITE is an electric transmission substation in Colorado. It is classified as high-voltage (345 kv) and connects 9 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage230 kV
Voltage classHigh-voltage (345 kV)
Connected lines9

Ownership & operation

Operator not catalogued for this substation.

Coordinates39.6858, -104.0203

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MISSLE SITE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MISSLE SITE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LIMON WIND #1Substation-AdjacentCOElbert County345 kV600 MW6.9 yrs60.5
MISSLE SITESubstation-AdjacentCOArapahoe County345 kV600 MW6.9 yrs60.2
BIG SANDYSubstation-AdjacentCOLincoln County230 kV300 MW6.9 yrs59.5
CEDAR POINTSubstation-AdjacentCOElbert County230 kV300 MW6.9 yrs58.6
TAP206216Substation-AdjacentCOMorgan County230 kV300 MW6.9 yrs58.4
UNKNOWN204006Substation-AdjacentCOElbert County230 kV300 MW6.9 yrs58.2
TAP206215Substation-AdjacentCOMorgan County230 kV300 MW6.9 yrs58.2
UNKNOWN205156Substation-AdjacentCOArapahoe County115 kV100 MW6.9 yrs55.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for MISSLE SITE substation, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.